On November 21, 2024, the second phase of the Heizhiguo Township Photovoltaic Power Station project in Yunnan, jointly invested and constructed by Bees Energy, achieved its first grid connection, marking a milestone achievement in the project construction.
The project is located in Heizhiguo Township, Guangnan County, Wenshan Zhuang and Miao Autonomous Prefecture, Yunnan Province. The total installed capacity on the DC side is 108MWp, and the total area is about 2016 acres. After the project is completed, the average annual power generation is expected to exceed 130 million kWh, which is equivalent to saving about 16000 tons of standard coal and reducing carbon dioxide emissions by nearly 100000 tons per year. It will effectively promote the transformation of the local energy structure and drive local economic development.
The project is located in a remote area with undulating mountains and steep terrain. The construction team aims to build high-quality projects and always adheres to the "six major controls and seven zeros" high-quality and refined engineering management mode. They strictly follow standardized operating procedures, repeatedly survey the site conditions in mountainous areas, strengthen collaboration, closely focus on key nodes, overcome many unfavorable factors such as steep mountain roads and complex climate, develop special transportation plans, ensure the efficiency of photovoltaic module transportation, and achieve high-quality project performance with high standards and strict requirements. During the project construction process, the project department also absorbed a large number of local workers, providing them with sustainable employment opportunities. This not only increased the income level of local workers, but also strengthened their understanding of new energy knowledge, injecting new vitality into rural revitalization.